"Federal Road Agency" told a detail repairs are expensive to Lake Teletskoye

Show original
In respublika Altay there is repair 24 km of the Chuysky path. Works will begin on other sites of the road soon to Lake Teletskoye. Besides, the authorities prepare design documentation on 27 km of the route and five bridges. 19 more km will design soon. About it reported in the press service "Federal Road Agency". Soon repair on sites from the village of Kyzyl-Ozek to the village Karasuk (km 10 – has to begin km 24) and from the pass Karasuk to the village Paspaul (km 31 – km 41). Them will put into operation this fall. On 80-88 km of a path capital repairs will end in 2022. "Road on all extent needs carrying out...