Belonging Russian Federation for 75% the Tajik hydroelectric power station "Sangtuda-1" can stop due to the lack of the work permit
Dushanbe, on July 31 (information agency "Big Electric Power News") Open joint-stock company "Sangtudinskaya GES-1" the water-engineering system second for power in Tajikistan 670 MWt can suspend work because Minenergo respubliki without explanations do not prolong some months terms of allowing documents for work, director generals Open joint-stock company "Sangtudinskaya GES-1" Shevnina Alexandra to the Minister of Energy and water resources of the republic Dahl r Dzhuma, available Federal state unitary enterprise RAMI "RIA Novosti" are told in the address. The share of companies Russian Federation in authorized capital Open joint-stock company "Sangtudinskaya GES-1" makes 75% a minus 1 action, a share Tajikistan 25%...