The heating main failed in Zerenda. Hundred people remained without heatings (video)

@NUR.KZ
Show original
In the resort settlement Zerendi in Akmola Region the heating main laid at the height of three meters failed. Five hundred people remained without heatings, transfers a KTK TV channel site. As reports TV channel, the collapse of the pipeline frightened locals. "I went on road and heard a gnash. And then I raise the head, I look: falls. Aside ran off – well, well that on the street it was simple nobody at this moment: neither children, nor cars. And so anybody would not manage to escape. People povykhodili, looked. Already on the neighboring street was – noise it was audible as it fell", - Zerenda's inhabitant Svetlichny Andrey shared...
Analysis
×
Asen Zhaksylykov
Last position: Akim (Akimat of Zerendinsky area)
Svetlichny Andrey
Baygabylov Yesimkhan
Google
Main activity:Science and education
85
YouTube
Manufactured by:Google
112