The Force of Siberia pipeline held on to the last point in China

@TAdviser
Show original
Soderzhaniyeistoriya 2022 Force of Siberia Pipeline will hold on to the last point in China Growth of deliveries in 7 months for 60% 2019 PUBLIC JOINT-STOCK COMPANY "GAZPROM" since September 1 will start filling with raw materials the Force of Siberia gas pipeline PUBLIC JOINT-STOCK COMPANY "GAZPROM" in 2019 will direct on the Force of Siberia project of 147,5 billion rubles 2018: PUBLIC JOINT-STOCK COMPANY "GAZPROM"" constructed 84,4% of "Force of Siberia" 2016: PUBLIC JOINT-STOCK COMPANY "GAZPROM" slows down construction 2014 Agreement "Force of Siberia-2" on increase in deliveries on the western route the Agreement PUBLIC JOINT-STOCK COMPANY "GAZPROM" and to China National Petroleum COR for 30 years Read also Notes the Main article: Gas export from Russian Federation the History 2022 Force of Siberia Pipeline will hold on to the last point...
Analysis
×
Alexey Miller
Last position: Chairman of the board (PJSC Gazprom)
48
Vitaly Markelov
Last position: Board member, vice chairman of the board (PJSC Gazprom)
Burmistrova Helena
PJSC Gazprom
Main activity:Production and distribution of the electric power, gas and water
453
CNPC
Main activity:Production of coke, oil products and nuclear materials
17
LLC "Gazprom export"
Main activity:Production and distribution of the electric power, gas and water
22
Nord Stream AG
Main activity:Production and distribution of the electric power, gas and water
7