Spain were going to stop one of the largest hydroelectric power stations because of an abnormal drought

@360° Podmoskov'e
Show original
Unsplash the Spanish company Endesa, S. A prevented about a possible suspension electricity generation on one of the largest hydroelectric power stations of the country because of an abnormal drought. The El Periodico de Aragon newspaper reported about it. The edition noted that if the drought will remain soon, Endesa, S. A will be compelled to stop production at Mekinensa's station (Autonomous community of Aragon) because of the low power of a reservoir. This hydroelectric power station is included in ten the largest hydroelectric power stations Spain. In companies emphasized that the decision on a suspension of work can make in the middle of November. "It will be...
Analysis
×
Endesa
Main activity:Production and distribution of the electric power, gas and water