In PUBLIC JOINT-STOCK COMPANY "ENEL RUSSIA" terms of start of the Kola VES connected with a lawsuit result with Siemens Gamesa

@Interfaks
Show original
Moscow. October 10. information agency "Interfaks" - PUBLIC JOINT-STOCK COMPANY "ENEL RUSSIA" yet did not declare a new date of completion of constructions the Kola VES, a lot of things will depend on judicial proceedings with Siemens Gamesa, general director PUBLIC JOINT-STOCK COMPANY "ENEL RUSSIA" Jeanne Sedova "Told the Power Policy magazine. As for terms, we at first planned end in July, then in October, 2022. While we did not declare new dates, but now a lot of things will depend on judicial proceedings with Siemens Gamesa. I, actually, look very positively at completion of constructions the Kola VES and is sure that we already on the finishing...
Analysis
×
PJSC Lukoil
Main activity:Mining
179
PJSC Enel Russia
Main activity:Production and distribution of the electric power, gas and water
Enel
Main activity:Production and distribution of the electric power, gas and water
LLC "SGRE"
Organizations