Vladimir Uyba told about readiness Rovenkov to a heating season

@BNK
Show original
The head of the region wrote down the video address straight from the sponsored city. - We in Rovenky carry out very large volume of works. Here our six crews – and on preparation of boiler rooms, heating mains work, and those who establishes windows, repairs a roof. The most important work is connected with school. We now increase additional forces as much as possible to reduce number of days of distance education. The approximate term of opening of schools – on September 20. The most important on preparation for the winter period – all terms are sustained. Long before the beginning of the heating period we will finish all necessary work. Rovenky will be...
Analysis
×
Vladimir Uyba
Last position: Head (Government of the Komi Republic)
7