"Scandinavia" keeps speed: the twenty-kilometer site of the route can be put into operation in October, 2022

@KtoStroit.ru
Show original
The next site of the federal highway "Scandinavia" (with 80th on the 100th kilometer) can be handed over for a year before term — in the middle of October of the 2022nd. About it reported the source close to the project...