"Science and technology park" of KGUSTA prepares the feasibility report on construction of the railroad Balykchy — Kara-Keche

@Akchabar
Show original
Photo: KTZH State enterprise "National company "Kyrgyz temir zholu" signed contract with GP the Scientific and technical center "Tekhnopark" of KGUSTA on development the feasibility study construction projects iron Balykchy — Kochkor — Kara-Keche are expensive . Construction length of planned iron roads makes 186.3 km and is subdivided into two sites: Balykchy — Kochkor (63 km) and Kochkor — Kara-Keche (124 km). The first stage of implementation of this project it is planned to start construction on a site Balykchy — Kochkor about 63 km long. Now there is a work on...