To Republic of Buryatia stopped building policlinic in Tarbagataye

@Vostok-Teleinform
Show original
In Tarbagataye construction policlinics is complete – there is a debugging of engineering systems in an operating mode under loading, small defects are eliminated. The population plan to open policlinic for reception at the beginning of March, reports information agency "Vostok-Teleinform" with reference to UKS on Republic of Buryatia. - Small defects are now eliminated. There is one more nuance: the equipment is mounted at the same time with personnel training therefore there is small "gap" on time which is necessary that future operators – physicians – worked on this equipment, "were accustomed" to it. I think that within two-three weeks all works...
Analysis
×
Eugenie Lukovnikov
Last position: The vice-chairman on development of infrastructure (Government of the Republic of Buryatia)
Valentina Matviyenko
Last position: Chairman (Council of Federation of the Federal Assembly of the Russian Federation)
223
Aleksey Tsydenov
Last position: The head of the Republic of Buryatia is the Chairman (Government of the Republic of Buryatia)
13
Svetlana Shabarshova
Last position: Head (Municipal state institution municipal entity administration Tarbagatai district)
Ruzavin Nicholas