On border with Belarus works of the second stage of the equipment of a physical barrier] begi

Show original
Responsible for implementation of the project of a physical barrier on border with Belarus the power group Epso-G began works of the second stage of the equipment of a physical barrier, reported on Tuesday the government...
Analysis
×
Ingrida Shimonite
Last position: Prime minister (Government of Lithuania)
8
Kauno Tiltai AB
Organizations