On the Saratov hydroelectric power station complex doctrines on check of readiness for emergency elimination] took plac

Show original
On the Saratov hydroelectric power station (branch Public joint-stock company "Federalnaya Gidrogeneriruyushchaya Kompaniya-Rusgidro") there passed complex doctrines on check of readiness of the enterprise to actions according to the prevention and elimination of possible emergency situations and protection of the population and territories in case of accident on hydraulic engineering constructions. Planned doctrines are a component of the program of actions for declaring of safety hydraulic engineering constructions in 2021...