Litgrid AB started reconstruction of VL of 330 kV the Lithuanian ES – Alytus

Show original
The system operator Lithuania Litgrid AB started works on reconstruction of VL of 330 kV the Lithuanian ES – Alytus. During reconstruction 210 support and wires of VL of 330 kV the Lithuanian ES – Alytus will be replaced, and also the lightning-protective cable is suspended with...