The Nizhny Novgorod low pressure water-engineering system passed the state examination

Show original
On February 18, 2019, broadcasting company "Nizhny Novgorod" (video). The first stage of the project on construction the Nizhny Novgorod low pressure water-engineering system passed the state examination. In the next months will begin constructions of the construction, urged to solve a problem with a shallowing of Volga on a 40-kilometer site from Gorodets to Nizhny Novgorod and to restore navigation, in particular, large-capacity fleet. Dredging works which are carried out, injure the river. In Sormovsky rayon Nizhny Novgorod where the reservoir will take place, and pass public hearings of the project in Balakhna...