Bridge repair in Kameshkovo prolonged for half a year

Show original
The decision on extension of restrictions on movement on the overpass through the railroad on Korunova Street was made at meeting of the commission on emergency situations and to fire safety of the area. These restrictions are connected with overpass reconstruction. The administration regularly holds meetings with the contractor, state control and state examination. The head of administration of the area Anatoly Kurgansky noted that works on the overpass are still continued. However there are difficulties because of limited time during which it is possible to carry out works on ways. Due to the changes in the project, term...