Power engineering specialists of "Tverenergo" confirmed availability for service during the autumn and winter period

Show original
The status symbolizing timely preparation of an electronetwork complex of the region by winter, is received by "Tverenergo" on the basis of the solution of the Order of the Ministry of Energy of the Russian Federation confirming readiness of the Rosseti Centre company and all branches of the organization to passing of an autumn and winter maximum of temperatures. All planned actions provided by production programs, are executed in full. For increase of reliability of power supply on all Tver Region more than 308 km of power lines of 0,4-110 kV, 1210 support of air-lines of all classes of tension are repaired, replacement is executed...