In the village in the east of Republic of Karelia updated water supply system, constructed 37 years ago

Show original
In Pyalm's village Pudozh district came to the end works on repair local water supply systems, constructed in 1986. Networks more than 8 kilometers long became during this time very worn-out that affected quality of water, volumes and a regularity of its giving. As told in Ministry of the Republic of Karelia on National Politics, public relations, religious organizations and the media, within the Program of support of local initiatives water supply systems with the general extent of 500 meters carried out repair on streets Road and the Embankment. Besides, repaired 4 water wells and 6 water intaking columns. The total cost of the project makes 3,17 million rubles of which 2 million rubles made...