Power engineering specialists of PUBLIC JOINT-STOCK COMPANY "TERRITORIAL GENERATING COMPANY-14" built for the Regional nursery of hospitals the new highway

Show original
Specialists of the power company constructed thermal networks, and also reconstructed a highway 400 meters long site for connection of a health care facility to the centralized heating. The regional nursery hospital is built thanks to the national Health care project. The strategic project on technical accession was in focus of attention of heads of the power company: a number of exit meetings with participation of the Chairman boards of directors PUBLIC JOINT-STOCK COMPANY "TERRITORIAL GENERATING COMPANY-14" Konstantin Mikhaylovich Lyulchev and director generals Aleksey Kakaulin was carried out. "Today all conditions for connection are created...