The project of an underwater electrocable from Lithuania to Poland can replace with the land high voltage line

Show original
Moscow. November 13. information agency "Interfaks" - Most expensive and the large project on synchronization of power supply networks of Baltics with Europe – the sea Harmony Link cable between Poland and Lithuania, probably, will be reformatted, and instead of the underwater the land power line (high voltage line) will be constructed, reported to agency BNS four sources. It is supposed that such option will allow to create the important high voltage line from the commercial point of view before 2030 and will be much cheaper in realization. However such alternative will demand the political agreement between Vilnius and Warsaw and approvals Yevropeyskaya commission...