Tyndinskaya transport prosecutor's office carries out an inspection upon damage of an alarm and blocking cable that led to a delay of cargo trains

Show original
18.10.2023 in 21.15 h. local time on 2043 km of a stage of Talum – Chelyabinsk the Tyndinsky region Branch JSC "RZHD" - Far East railroad (Amur Region) by production works as contract organization JSC SMU-868 as the excavator the cable for the alarm system and blocking is damaged. Two cargo trains are as a result detained for 45 min. Now movement of trains on a stage is restored in full. Tyndinskaya transport prosecutor's office carries out an inspection of observance of the legislation about safety movement and operation railway transport. At identification of violations it will be accepted...