The hydroelectric power station in the Brazilian Santu Antoniu stopped work because of a drought

Show original
For station the river Autonomous Region of Madeira which level of a drain fell to 50% is a power source. "Joint-stock company "Khimfarm" Antonio Energia temporarily suspended work of the object" — follows from the statement on the page of the operator in a social network. Local mass media write that in a zone of disaster there were more than 15 thousand inhabitants of coastal areas. Because of the shoaled wells they are deprived of access to drinking water which should be bought for tens kilometers from the house...