Kambar-Ata-1: about start of the largest hydroenergy project in Kyrgyzstan

Show original
Source: economist.kg on August 22, the deputy chairman of Cabinet of Ministers of KR Bakyt Torobaev, announced fast end of a preparatory stage of works on Kambaratinsky GES-1. The financial Economist.kg edition prepared for readers answers to the most topical issues on construction strategically important hydropower object in County of Jalal-Abad. What will be the power of hydroelectric power station "Kambar-Ata-1" the Project assumes construction the 1860 MWt hydroelectric power stations, of reservoirs of 5.4 billion m ³. The hydroelectric power station annually will make on the average 5.6 billion kWh of the electric power. At what stage is...
Analysis
×
Sadyr Nurgozhoevich Zhaparov
Last position: President of the Kyrgyz Republic (President of Kyrgyzstan)
57
Bakyt Torobaev
Last position: Deputy (Parliament of the Kyrgyz Republic)
Adylbek Kasymaliev
Last position: First Deputy Chairman (Government of the Republic of Kyrgyz)
1
Almazbek Atambaev
Main activity:Politician
2
Taalaybek Omukeevich Ibraev
Last position: Minister (Ministry power engineering specialists and industries Kyrgyzstan)
PUBLIC JOINT-STOCK COMPANY "RUSHYDRO"
Main activity:Production and distribution of the electric power, gas and water
150