The updated bridge in Dirt equipped with clever system of a reservoir with the built-in filtration
The first the updated bridge through Matyra for durability was tested by cargo equipment. By tradition – that the crossing long served. Afterwards there went passenger buses. Since August 20 restored former routes: "Lipetsk – Plekhanovo" and "Dirt – Butyrka – Lipetsk". On pleasure to gardeners. From outside motorists too did not do without positive emotions. The first overhaul in 60 years. On it directed a floor of billion rubles within the Safe Qualitative <8> Are Expensive 8> national project. It is the only road artery through the river so to overestimate value of reconstruction difficult. "Movement in the center of the area and from the center...