Movement around the Sselkovsky fork Lipetsk Region is restored

Show original
These Lipetsk discusses roadwork the second day. Repair the bridge on "Tambovki's" 306th kilometer collected yesterday stoppers on some kilometers. 20 minutes from Sselok to "Tambovki". Last evening the same way took some hours from drivers. Residents of Lipetsk blame for stoppers road builders. And those is faulty equipment. "The complicated movement happened on the bridge because there was a failure in operation of the traffic light", – the job foremaster Filimonov Igor commented. The traffic light regulated reversive movement on the Sselkovsky fork. Today it opened on two strips. And by a dinner repaired also the electronic...