Why repair on the "humpbacked" bridge in Nur-Sultan is tightened

Show original
In Akimat of City of Astana told why repair a site of Alash Highway passing through the "humpbacked" bridge is tightened. The left side of a construction completely closed for journey on January 13. As noted in profile management akimat while works on dismantle of elements of the bridge from which already removed 70 beams are conducted. Directly repair will carry out next year. The conclusion from state examination is expected in December. "Works conduct over tracks, and Joint-stock company "National company "Kasakhstan Temir Zholy" allocates in day from two to three hours for dismantle. Besides, at a wind speed over 15 m/s crane use not...