On Guerrilla state district power station will install additional boilers and turbines

Show original
FAU "Glavgosekspertiza Russia" issued the positive conclusion following the results of consideration of design and budget documentation on expansion of Guerrilla state district power station. The guerrilla state district power station is included into branch JOINT-STOCK COMPANY "DALNEVOSTOCHNAYA GENERIRUYUSHCHAYA COMPANY" "Seaside generation". The most part of year it is used as the heating power plant intended for development of electric and thermal energy. Design documentation, FAU "Glavgosekspertiza Russia", provided installation of two boilers and steam turbines. Total rated capacity of the second turn of Guerrilla state district power station will make 280 MWt. Also...
Analysis
×
Bulakhtin Andrey
PUBLIC JOINT-STOCK COMPANY "RUSHYDRO"
Main activity:Production and distribution of the electric power, gas and water
183
JSC DVGC
Main activity:Production and distribution of the electric power, gas and water
12