Kenya declared end of the part of the construction project cross-border HVAC of the high voltage line of 400 kV capacity 2 GW between power supply systems Kenya and Tanzania. High voltage line extent in the territory Kenya

Show original
Kenya declared end of the part of the construction project cross-border HVAC of the high voltage line of 400 kV capacity 2 GW between power supply systems Kenya and Tanzania. High voltage line extent in the territory Kenya made about 93,1 km, and the cost of constructions – $309,26 million. To put into operation of the high voltage line which has crucial importance for increase in exchanges of the electric power between two countries, it is planned at the end of the current year. Cross-border HVAC of the high voltage line of 400 kV between power supply systems Kenya and Tanzania, construction project which is realized by the Kenyan company Kenya Electricity Transmission...