Preparation of municipal services for autumn winter period of 2023-2024 conduct in Klin

Show original
At present here 21 boiler rooms and 7 TsTP Many districts situated near Moscow already are capitally repaired housing stocks started preparing communication infrastructure for autumn winter period of 2023-2024. Such work and in Klin is conducted: according to the plan of preparation for fall and winter of objects of water supply here are prepared 21 boiler rooms and 7 TsTP, planned works on replacement and overhaul of locking fittings, thermal networks, pipelines, coppers and the electropower equipment are at present conducted. The head reports Klin about it gorokruga Alena Sokolskaya. In particular, as for...
Analysis
×
Alena Sokolskaya
Last position: Head (Administration of the municipal district Klinsk)