To Republic of Bashkortostan financing programs of gasification increased many times

@ResBash
Show original
The corrected program of development gas supply and gasifications of the republic which the region this year re-signed from PUBLIC JOINT-STOCK COMPANY "GAZPROM", in the financial plan increased to 27 billion rubles, general director LLC "Gazprom mezhregiongaz Ufa" Gazprom mezhregiongaz Ufa" Albert Lukmanov. The program is intended for the period of 2021 — 2025. Albert Lukmanov pointed to its distinctive feature: if earlier local gas pipelines were financed at the expense of means of the republic, now it is a duty of the uniform operator. Financing programs by 4,5 times exceeds the sizes...
Analysis
×
Rady Khabirov
Last position: Head of the Republic of Bashkortostan (Government of the Republic of Bashkortostan)
82
Albert Lukmanov
Last position: CEO (LLC "Gazprom mezhregiongaz Ufa")
2
Alexander Nikolaevich Sheldyaev
Last position: Minister (MINPROMENERGO BELARUS)
6
PJSC Gazprom
Main activity:Production and distribution of the electric power, gas and water
466
LLC "Gazprom mezhregiongaz Ufa"
Main activity:Production and distribution of the electric power, gas and water
4