On the bridge through Selemdzhu in Amur Region the most difficult stage of works] came to the en

Show original
In Amur Region the most difficult came to the end "" a stage of works on the bridge through the river Selemdzha, "the Selemdzhinsky messenger" reported. According to the newspaper, the damaged support of a construction are completely restored, additional support and bearing support of ledootboyny designs are established, crossbars are mounted. On Wednesday, March 15, assembly of flying designs started. On March 20 installation of ice cutters is planned. Laying of a flooring and end of a preparatory work are appointed to April 1. On April 10 works on repair the bridge have to be ended. With reference to Administration of the Selemdzhinsk district it is noted that movement...