On the Minsk CHPP-3 the steam turbine and a power copper] are installe

@EnergyLand.info
Show original
The ceremonial opening of object within the "Reconstruction of the Minsk CHPP-3 with Replacement of Leaving Capacities of Turn of 14 MPas" project the 1st turn took place...
Analysis
×
Mitkovets Youri
Maslyak Sergei
Reut Andrey
Yushkevich Victor
GPO "Belenergo"
Main activity:Production and distribution of the electric power, gas and water
4