Head of the region Gamaly Sergei: The Hmelnitsky nuclear power plant is disconnected from a power supply system

Show original
The Hmelnitsky nuclear power plant was disconnected from a power supply system Ukraine in the afternoon on November 23. The head of Hmelnitsky regional military authorities Gamaly Sergei. The station is in Netishyn, near the river Gyryn. Its basic purpose - a covering of deficiency of power capacities in the Western region Ukraine. At present power supply networks in area are switched-off, there is no tension in the majority of communities (except Belogorie, Teofipol, Polonne and Volochysk), were written by Gamaly Sergei in the Telegram-channel. The part of the city of Khmelnytsky remained without water supply, he specified. In the afternoon on November 23 after that...
Analysis
×
Gamaly Sergei
State enterprise NEK "Ukrenergo"
Main activity:Production and distribution of the electric power, gas and water
15