"It is necessary to approach competently": the ecologist urged to consider risks at construction the pool in the Gulf of Finland
The open pool in the water area at the Krestovsky island plan to build by 2025. Design documentation exposed for public discussions within ecological state examination. According to the project, two bowls of pools will be constructed: the big — 50 by 25 meters and small — 20 by 10 meters. To read...