In Biysk the pontoon bridge started preparing for cultivation for a while ledostava

Show original
Cultivation of the floating bridge ledostava is planned for the period in 2-3 weeks In Biysk on the pontoon bridge a preparatory work before a winter season began. As told "BR" Victor Aleksandrovich Franck, cultivation of the floating bridge probably will happen in 2-3 weeks. Before this action it is necessary to prepare a construction carefully. Photo Pontonny Bridge: Kulygin Sergei "," - Now workers rechporta measure by BR bottom depth, check cables, anchors. If something needs to be repaired, it will be at once made. The bridge has to be completely prepared for distributing, - told...