construction the third turn of northern round Rostov-on-Don] comes to the en

Show original
Readiness of the third turn of the new highway is close to 100%, reports the Don Mintrans. Northern round (the general extent – 35 km, the third turn – 12,8 km) will connect highways Rostov-on-Don – Rodionovo-Nesvetayskaya – Novoshakhtinsk and A-280 Rostov-on-Don – Taganrog bypassing the village Chaltyr Myasnikovsky district. Construction stages were presented to the third turn of round on an exposition Rostov Region within the International forum "Is expensive-2022" which passed to Kazan. Registration and the maintenance of the exposition prepared AP "AIR" together with...