To Amur Region on request of the prosecutor Zeya violations of requirements of the legislation about safety operation of the hydraulic engineering construction] obliged to eliminate Administration of

@Novosti prokuratury RF
Show original
Skovorodinskaya transport prosecutor's office carried out an inspection of performance of the legislation about safety movement and operation water transport on the Zeya Reservoir during which numerous violations of requirements Federal law of the Russian Federation of 27 December 2002 No. 184-FZ "On Technical Regulation" and Technical regulations about safety objects an internal water transport are revealed. It is established that Administration of Zeya Amur Region, being the owner of the berthing hydraulic engineering construction on the bank of the gulf Small Garmakan, during operation of this construction did not provide development and maintaining...