On the fifth block of Novocherkassk state district power station repair work] came to the en
OGK-2 finished on the power unit No. 5 of Novocherkassk <6> GRES capital repairs . Actions were realized for the purpose of increase of reliability of work of the generating equipment. So, experts replaced heating surfaces kotloagregata, carried out repair the boiler and turbine equipment, upgraded the generator, gorelochny devices and pyleprigotovleniye systems. The power unit successfully passed technological tests, the equipment is included in a network. Reference: Novocherkassk state district power station – one of the largest thermal power plants of the Integrated power system of the South. The established electric power...