Power engineering specialists Ulan-Ude started connecting to hot water supply houses and sotsobjekty

@TASS
Show original
Since December 27 kindergartens in two areas will resume work...
Analysis
×
Igor Shutenkov
Last position: Mayor (Administration of Ulan-Ude)
6
PJSC TGC-14
Main activity:Production and distribution of the electric power, gas and water
31