The second stage of construction the Bagayevsky water-engineering system begins on Don

@DON24
Show original
Rostov Region, on November 25, 2021. DON24.RU. The state contract on construction the second stage of the Bagayevsky water-engineering system signed in Rostov Region. For works it is provided by 27,9 billion rubles, reported in Government of Rostov region with reference to the head of Federal state-funded institution "Azovo-Donskaya basseynovaya administration" Sergei Konstantinovich Gaydaev. At this stage will equip constructions of the pressure head front and a ruslovy reservoir. This year development working documentation, construction of the rotational settlement and a power line will begin. Also it is planned to clear away the territory of constructions, to prepare the temporary...
Analysis
×
Sergei Konstantinovich Gaydaev
Last position: Head (Federal state-funded institution "Azovo-Donskaya basseynovaya administration")
Vladimir Okunev
Last position: Minister (Ministry for transport of the Rostov region)