In Kostroma will repair the bridge through down the street Kalinin

Show original
In Kostroma will repair the bridge through the river Black down the street Kalinin, reports Rostender. COMMITTEE ON CONSTRUCTION, TO TRANSPORT AND ROAD ACTIVITY OF ADMINISTRATION OF THE KOSTROMA CITY holds open competition in an electronic form for repair work. They will pass within the municipal program "Traffic safety in the territory of Kostroma". Length of the bridge which needs to be updated, makes 121,74 m, width – 19,526 m the Contractor should carry out works on a road bed, road clothes, bridge footings, flying structures, a drainage system and treatment facilities...