The president Botswana participated in a ceremony of the beginning of laying water supply systems which is built by the Chinese company

@IA Sin'hua
Show original
Gaborone, 21 October/Xinhua / Ceremony of the beginning of constructions a water branch took place today in Lobatse / Botswana/. Construction works the local division of the Chinese companies carries out China State Construction Engineering COR Ltd / CSCEC/. The president Botswana Mokvetsi Eric Kibetsve Masisi participated in a ceremony and personally made the first dredging, being in an excavator cabin. The water branch will be stretched from Gaborone to Lobatse along highways to A1. The term of constructions under contract makes 12 months. Financing the project is carried out by the government Botswana, the general...