Prosecutor's office Ust-Kan district Altai Republic achieves installation of additional transformer substation for inhabitants with

Show original
the area in connection with the arrived addresses from inhabitants of page Mendur-Sokkon Ust-Kan district respublika Altay about a failure to provide objects of electronetwork economy of demanded number of tension the electric power on some streets of page Mendur-Sokkon is carried out by Prosecutor's office an inspection regarding observance of requirements of standards of the Federal law of 26.03.2003 No. 35-FZ "About power industry". It is established by the carried-out inspection that in the page territory Mendur-Sokkon is available 7 transformer substations. At the same time, to 2 transformer substations, 63 kVA everyone about 100 household are connected...