In Kizel started the second stage of modernization of system of water supply

Show original
In Kizel capital repairs a conduit from pump stations the III lifting to the main transit conduit began. Extent of a new branch of a conduit makes more than 6 km. From budgets Perm Territory is directed on object reconstruction about 43 million rubles the Contractor will establish the special polyethylene pipes steady against rushes, and also the new pump equipment. To m / r the Southern contractor will replace about 2 more km of networks of the central conduit with the means saved within competitive procedures. Thus, in 2021 in Kizel will replace about 8 more km of emergency networks. "The sore municipal...
Analysis
×
Dimitri Nikolaevich Makhonin
Last position: Governor (Government of the Perm Territory)
25
Andrey Aleksandrovich Kokorev
Last position: Minister (MINISTRY ZHKKH I BLAGOUSTROYSTVA OF THE PERM TERRITORY)
2