Installation of temporary ZhD of a platform started in one of the villages of Shatura
Inspectors of the Glavgosstroynadzor began check of a course of reconstruction of a railway passenger platform in the village of Krivandino of Shatura. "Works on installation of a temporary platform are at present conducted", - the chief of the Glavgosstroynadzor Arthur Garibyan commented. According to the project, reconstruction includes replacement of bearing designs of an existing platform, with the device of canopies, the small architectural forms, the reconstructed platform as will be equipped with all necessary engineering systems. "Check on object will last till May 25. If during this time inspectors are...