Application of BIM accelerates design for 50%

@DOMEX
Show original
On April 27, 2021 "Speed is reached due to optimization of introduction of adjustments. For example, if earlier at change materials and colors of a facade detailed recalculation of account part was required earlier, now it becomes automatically for some seconds", - the deputy director for development told products to A101 Group Bryzgalov Pawel on IPquorum 2021: tech for content. digitalizations following after a BIM stage construction branch, according to Bryzgalov Pawel, become parametrical design. Computer algorithms on the basis of the entered parameters of the territory, types real estates...
Analysis
×
Bryzgalov Pawel
Mikhail Gutseriyev
JOINT-STOCK COMPANY "GRUPPA SAFMAR"
Main activity:Activity of hotels and restaurants
45