"Vysotsky the grain terminal" is recognized by the large-scale investment project

@KtoStroit.ru
Show original
Within the project the 200 thousand tons per year sea cargo terminal with power up to 4,0 million tons and industrial complex will be constructed. It is planned to put the sea terminal into operation in 2023, and production — in 2024...