On the river Izh started establishing pump stations

@IzhevskInfo
Show original
On a protecting dam the round-the-clock watch for continuous controls behind a situation with a high water is conducted. On April 5 on the river Izh started mounting two pump stations which will pump over the flood waters which have arrived from Pervomaysky rayon from heat-sink capacity, reported chapter Izhevsk Oleg Nikolaevich Bekmemetyev on the page in social network "VKontakte". The contract organization will work before high water end. Also experts round the clock are on duty on a protecting dam constantly to control a situation. It is noted that installation of the pump and power equipment — one of the main actions at...