The contractor will remake a low-quality asphalt covering on a hydroelectric power station dam

@Tvoj Irkutsk
Show original
Works was planned to finish by September 15. Because of rains repair suspended...
Analysis
×
Ruslan Nikolaevich Bolotov
Last position: Mayor (Administration of Irkutsk)
8
JSC EuroSibEnergo
Main activity:Production and distribution of the electric power, gas and water
5
LLC "ARMSTROY"
Companies