rukovoditel of Izhevsk and UKS checked preparation of objects of a heat supply for a heating season
Chapter Izhevsk Bekmemetyev Oleg and the deputy chief engineer LLC "Udmurtskie kommunalnye sistemy" Anatoly Shpakov checked a course of work on preparation of heating systems for the heating period. They visited object of reconstruction of the main heating system on Stroiteley St. Here LLC "ADMINISTRATION OF CAPITAL CONSTRUCTION" conducts works on replacement of 1 km of pipelines with a diameter of 400 mm that as a result will increase quality of a heat supply in 85 houses and institutions Industrialny rayon. The thermal highway was laid in 1964, and during operation was not exposed to capital repairs. By words Anatoly Shpakov, still it...