83 kilometers of roads and bridge. Uprdor "Vilyuy" summed up the results of 2019

Show original
As the press service of managements reports, on the route "Vilyuy" into Sakha (Yakutia) Republic is put into operation of 83 km of highways (repair — 35,9 km, capital repairs — 38,3 km, construction and reconstruction — 8,8 km). Thanks to the performed works in 2019 the asphalt concrete covering on all site from Yakutsk (km 7) to page Berdigestyakh ulus Gorny (km 188) is provided...